Site 3, Auckland

  • Date

    -

  • Client

    -

  • Categories
  • Website

    -

Site3

LM Dynahyd Hydraulic Drive

Architects Patterson & Co specified an external lift shaft for the commercial refurbishment of Site 3, formerly the historic Auckland city stables. The brief also called for raw, industrial-style materials for both the shaft and the lift.

We worked closely with the architects to ensure the lift met design specifications. These determined a fully glazed lift with a galvanised steel cage to enhance the industrial feel of the building.

Related Projects